專業(yè)術(shù)語(中英對照)
發(fā)布時(shí)間:2020-07-21 來源: 調(diào)查報(bào)告 點(diǎn)擊:
一、土建:
分包商:subcontractor;業(yè)主:client;進(jìn)度表:schedule form sheet;分包商投標(biāo)報(bào)價(jià):subcontractor’s quotation;建筑:architecture(building);結(jié)構(gòu):civil/structure;裝修:decoration;暖通:HVAC;電氣:electrical
電訊:telecommunication;消防:fire fighting;給排水:water supply and drainage;土方:earthwork;灰土:lime soil;回填:backfill(filling);壓實(shí):compaction;基礎(chǔ)梁:foundation beam;電纜溝:cable trench;地下設(shè)施:underground facilities;開挖:excavation;電纜橋架:cable tray;墊層:bedding cushion;澆注:cast;鋼筋混凝土:reinforce concrete;商品混凝土:prefix concrete;素混凝土:plain concrete;模板:formwork;養(yǎng)護(hù):curing;混凝土養(yǎng)護(hù):curing concrete 基礎(chǔ)螺栓:anchor bolt;預(yù)埋件:embedded steel;溝槽:trench;開洞:opening;電梯井:lift well;腳手架 scaffold;鋼筋的彎折、搭接、焊接:rebar bending、cutting、lapping and welding;上部結(jié)構(gòu):superstructure;混凝土框架:concrete frame structure;放線:alignment;定位:fix position;清理:clean up;平整:grade;支撐:support;振搗器:vibrator;塌落度:slump;添加劑:additive;混凝土標(biāo)號:class of concrete;打灰速度:rate of pour;打灰編號:pour number;預(yù)留孔堵塞:block out;養(yǎng)護(hù)方式:curing proposed;內(nèi)裝修:interior finished;外裝修:exterior finished;盤圓:bundled bar;木嵌條:cork joint;橫向施工縫:horizontal construction joint detail;縱向施工縫:longitudinal construction joint detail;填方區(qū):filling farm;挖方區(qū):cutting farm;零點(diǎn)線:zero line;施工標(biāo)高:construction elevation;設(shè)計(jì)標(biāo)高:design elevation;原地面標(biāo)高:ground elevation;建筑物和構(gòu)筑物:building and structure;防潮層:
damp proof course;素土:plain soil(raw soil);素土壓實(shí):compacted soil;壓實(shí)系數(shù):compacting factor;振搗混凝土:vibrated concrete;平板振搗器:vibrating board;振動(dòng)搗實(shí):vibrating compaction;振搗棒:vibrating needle;振動(dòng)夯:vibrating rammer;水準(zhǔn)儀:leveler;經(jīng)緯儀:transit;靠尺:running ruler;楔形塞尺:plug scale;表面平整度:surface plainness(surface levelness);抄平:take elevation;軸線位置:axial line position;截面內(nèi)部尺寸:the inner dimension of the section;層高垂直:floor height vertically;全高:entire height;相鄰兩板表面高低差 height difference between two
neighbor form plate;次梁鋼筋:sub-beam rebar;板鋼筋:slab rebar;灌注樁:cast-in-place pile;混凝土保護(hù)層:protective coating of concrete;鉆孔灌注樁:bore cast-in-place pile;地板:floor;基礎(chǔ)上筋:bottom bar of the foundation;基礎(chǔ)下筋:upper bar of the foundation material;滑動(dòng)端:sliding side;固定端:fixed side;水泥砂漿:cement mortar;細(xì)石混凝土:fine concrete;配筋圖:rebar arrangement;止水扳:water stop;底版平面:bottom slab plan;集污槽:sump tank;防爆墻:explosion-proof wall;靜電接地板:anti-static grounding floor board;凍土深度:frozen soil depth;抹灰:plaster。
二、鋼結(jié)構(gòu):
墊板:washer;底版:base plate;欄桿:handrail;打磨平整:grinder finish;剪切力:shear force;剪切面 shear area;雙剪連接:double shear connection;鋼性連接:moment connection;力矩系數(shù):moment coefficient;扭矩
torque moment(moment of torsion);軋制鋼板:rolled steel;角焊縫:fillet weld;柱腳底標(biāo)高:post elevation;加勁肋詳圖:detail of rib stiffen;散熱片:
cooling rib;橫肋:cross rib;加強(qiáng)肋:stiffening rib;支撐端頭:end detail of brace;豎向支撐接點(diǎn)板連接方式:gusset plate connection of vertical bracing;密封焊:seal welding;角鋼支撐:angle brace;格柵板卡具固定詳圖:details of clamp grating;穿管周邊鋼格柵詳圖:details of grating pipe;普通卡具連接形式:normal clamp type;鋼格柵鋪設(shè)詳圖:detail of grating construction;踏步板:stair tread;脹錨螺栓(加固螺栓):cinch bolt;梯梁:stringer;縱梁斜撐:stringer bracing;固定板:mounted plate;拐角處扶手(欄桿):railing at corner;塞焊:plug weld;門軸:gate axle;銷:pin;套管:sleeve;欄桿:handrail;H 型鋼:H steel;;槽鋼:channel steel;安全護(hù)籠:safety cage;鋼格板:grate;花紋鋼格板:CH.PL;雙向鋼筋網(wǎng):double bar-mesh;罐區(qū)地坪:paving of tank farm;零件:part;部件:component;構(gòu)件:element;小拼單元:the smallest assembled rigid unit;中拼單元:intermediate assembled structure;高強(qiáng)度螺栓連接副:set of high strength bolt;空間剛度單元:space rigid unit;焊釘焊接:stud welding;環(huán)境溫度:ambient temperature;抗滑移系數(shù):slip coefficient of faying face;鋼結(jié)構(gòu)防火:fireproof for steel structure。
三、樁基(pile foundation)
灌注樁:cast-in-place pile;混凝土保護(hù)層:protective coating of concrete;鉆孔灌注樁:bore cast-in-place pile;樁位圖:pile arrangement plan;樁頂標(biāo)高:the top elevation of the pile;樁承臺:pile cap;樁長:pile length;樁頭鑿掉:chip out the conic;靜載試驗(yàn):static test;單樁豎向承載力特征值:characteristic value of the pile vertical bearing capacity;單樁水平承載力特征值:characteristic value of the pile lateral bearing capacity;
動(dòng)力測試:dynamic testing;樁詳圖:pile detail;卵石土:cobble soil;螺旋箍筋:spiral hoop-bar;焊接箍筋:welding hoop-bar;縮孔:shrinkage cavity;收縮孔:shrinkage hole;收縮力:shrinkage stress;高應(yīng)變動(dòng)力檢測規(guī)程:specification for high strain dynamic testing of pile。
四、火災(zāi)報(bào)警系統(tǒng) 及電氣 fire alarm system and electrical 火災(zāi)報(bào)警主控制盤:fire alarm main Control Panel;聯(lián)鎖電源盤:Interlock power panel;聯(lián)鎖備用電源 Interlock UPS;手動(dòng)聯(lián)鎖控制盤:manual Interlock control panel;編碼感煙探測器:Coding Smoke Detector;編碼感溫探測器:Coding Heat Detector;通用底座:common basement;編碼手動(dòng)報(bào)警按鈕:Coding Manual Alarm Call Point;聯(lián)鎖控制模塊:Interlock Control Module;信號輸入模塊:Signal input Module;編碼聲光報(bào)警器:Coding Flash and Sound Unit;壁掛式模塊箱:Wall-mounted Module Box;分線盒:Branch Box;專用接地裝置:Special Grounding Unit;電纜匯線槽:cable tray;阻燃雙絞線:Non-fire Twisted Wire;水煤氣鋼管:conduit;網(wǎng)絡(luò)模塊:net module;無線對講機(jī):walkie-talkie;系統(tǒng)天線:antenna;充電器和電池:charger and battery;地下直埋線路:cable buried in the ground;沿建筑無暗敷設(shè)線路:cable concealed along the building;火警系統(tǒng)分線盒:fire alarm system branch box;雙孔信息插孔:double-hole outlet;沿吊頂內(nèi)敷設(shè)線路:cable installed in ceiling;屋頂下明敷設(shè)線路:cable installed under the ceiling;纜線由此引上:cable installed to upwards;纜線由下引來:cable installed from downwards;纜線由下引來并由此引上:cable installed from downwards to upwards;纜線由上引來纜線由此引下:cable installed from upwards to downwards;用電負(fù)荷圖表:load/motor list;防雷接地平面圖:grounding and lightning wiring;
插座平面圖:socket wiring;電氣管線表:electrical cable schedule;電纜敷設(shè)平面圖:cable laying diagram;中控?fù)潆娖矫鎴D:CCB power wiring;典型電路圖:schematic diagram MCC;單線圖:MCC single line diagram;CCB化驗(yàn)配電系統(tǒng)圖:CCB lab panel schedule;盤面布置圖:panel layout;CCB設(shè)備材料表:CCB list of equipment and material;配電箱編號/型號:panel reference /type;回路編號:circuit reference;風(fēng)機(jī):ventilator;負(fù)荷統(tǒng)計(jì)表:load summary;芯數(shù)及截面:cable cores and size;燈座:bulb holder;應(yīng)急燈:emergency lamp;單管熒光燈:fluorescent lamp with one tube ;三管熒光燈:fluorescent lamp with three tubes;帶應(yīng)急電源的雙管熒光燈 fluorescent lamp with two lamp with emergency power;二位單極暗裝燈開關(guān):conceal mounted lighting switch with two buttons;嵌入式燈具:recessed lighting;接地板:earth bar;接地極:electrode;接地線:grounding wire;接地干線:grounding bar;總接地網(wǎng):general grounding grid;利用柱內(nèi)內(nèi)鋼筋做引下線:use reinforcement in column as down conductor;防雷接地:grounding and lightning;銅包鋼:copper clad steel;避雷針:lightning rod;高壓進(jìn)線:Hv incoming feeder;中控樓電氣管線表:CCB electrical cable schedule;高壓進(jìn)線:HV incoming feeder;檢修插座:maintenance socket;現(xiàn)場操作拄:local control station;道路照明:road lighting;母線槽:bus duct;母聯(lián):bus coupler;母線:bus bar;成套裝置:package unit;靜電接地 :
anti-static grounding ; 土 壤 電 阻 :
soil resistivity ; 防 爆 型 :explosion-proof type;短路:short circuit;斷路器:circuit breaker;功率因數(shù):power factor;照明系統(tǒng):lighting system;路燈:road illumination;照明燈具:lighting fixture;照明配電箱:lighting distribution;變壓器中
性點(diǎn):transformer neutral;開關(guān)柜:switchgear cabinet;瞬時(shí)過電流繼電器:instantaneous over-current relay ; 延 時(shí) 過 電 流 繼 電 器 :
time delayed over-current relay;欠電壓繼電器:under voltage relay;接地故障繼電器:earth fault relay;跳閘或報(bào)警:trip and alarm;計(jì)量柜:metering cabinet;操作及故障指示燈:operating and fault indicating lamps;馬達(dá)控制中心:motor control center;短路電流:short circuit current;抽出式執(zhí)行部件:draw-out execution components;自動(dòng)切換系統(tǒng):automatic transfer system;相電流:phase current;微處理器:microprocessor;空氣斷路器:air break type circuit breaker;彈簧操作機(jī)構(gòu):spring operated mechanism;饋電空氣斷路器:feeder air circuit breaker;配備:equipped with;磁接觸器:magnetic contactor;備用輸出單元:spare outgoing unit;通風(fēng)裝置:ventilating apparatus;備用時(shí)間:back-up time;熱電阻:thermal resistance;額定電壓:nominal voltage;阻燃型:flame retardant type。
五、地下管線(under ground piping(U/P))
泡沫液管線:foam solution pipeline;循環(huán)給水管線:cooling water supply pipeline;循環(huán)回水管線:cooling water return pipeline;生活污水管線:sanitary sewer pipeline;雨水管線:rain water pipeline;消防水管線:fire water pipeline;球墨鑄鐵管線:ductile pipe;鋼骨架塑料復(fù)合管:metal framed plastic pipe;電熱熔焊連接:electrical fusion welding;無縫鋼管:seamless steel pipe;雙壁 UPVC 管:double –wall UPVC pipe;承插連接:socket connection;砂墊層:sand bed;沙石基礎(chǔ):sand stone foundation;室外消火栓,泡沫栓及水炮:outdoors hydrant,foam hydrant and water monitor;消火栓箱:hydrant cabinet;消防水龍帶:fire hose;水槍:spray nozzle;原
土:raw soil(plain soil);碎石:broken stone;泡沫槍:foam hose;閥門井:valve pit;儀表井:instrument pit;排水檢查井:manhole;雨水口:catch basin;強(qiáng)度試驗(yàn):strength test;嚴(yán)密性試驗(yàn):seamless test;設(shè)計(jì)參數(shù):design parameter;泄漏試驗(yàn):leakage test;化糞池:septic tank;水封井:seal manhole(well);保護(hù)鋼套管:pipe sleeve;地漏:floor drain;端口水泥沙漿密封:cement mortar used to seal ports;雨水管線:rain water pipeline;無縫鋼管:seamless(SMLS)pipe;彎頭:elbow;等徑三通:straight tee;異徑三通:reducing tee;異徑四通:reducing double tee;蝶閥:butterfly valve;法蘭:flange;墊片:gasket;閘閥:gate valve;重型井蓋:heavy –duty cover;井座:cover seat;輕型井蓋:light-duty cover;混凝土支墩:concrete abutment;管道支墩:abutment for pipe。
六、名稱:
中控樓:central control building;平面:plan;會議室:conference room;儲藏室:storage room;銷售經(jīng)理室:sale manager room;銷售財(cái)務(wù)部:sale and finance support room;財(cái)務(wù)經(jīng)理部:finance manager room;人力經(jīng)理室:human manager room;預(yù)留辦公室:future office;管道井:pipe-well;電梯機(jī)房:lift room;儲藏間:storage room;換熱間:heat exchange room;走廊:corridor;門廳:lobby;化驗(yàn)室:laboratory;機(jī)修間:work shop;消防閥室:fire fighting valve room;高低壓配電室:high volt(HV)and low volt(LV)switch room(distribution room);男更衣室:male locker;備餐間:cooking room;秘書檔案室:secretary and document room;男浴室:male shower;變壓器:transformer;門廳:lobby;急救室:first aid;消防鋼瓶間:fire fighting steel bottle storage;設(shè)計(jì)文件:design document;規(guī)范:code;當(dāng)?shù)匾?guī)定:local
regulation;標(biāo)準(zhǔn):standard;臨時(shí)設(shè)施:temporary facility;臨時(shí)工棚:temporary work shed;臨時(shí)水電:temporary power and water;臨時(shí)倉庫及料廠:temporary warehouse and storage;附件:attachment;概述:general;描述:summary;基本要求:basic requirement;地基條件:soil information;場地氣象條件:site climate condition;標(biāo)高系統(tǒng):elevation system;閥門室:valve house;罐區(qū):tank farm;潤滑油及廢液桶庫:lubricated oil and waste storage;泡沫站:foam station;自行車棚:bike shelter;計(jì)量站:metering station;旗桿:flag pole;停車位:parking stall;路標(biāo):road direction;人行道:walkway;設(shè)備倉庫:equipment warehouse;鍋爐房:boiler house;租賃倉庫:rental warehouse;車庫:garage;裝卸站臺:load and unload station;機(jī)柜室:cabinet room;男、女衛(wèi)生間:toilet for men and women;餐廳:canteen。
七、圖紙名稱 界區(qū)內(nèi):the battery limits;工藝裝置結(jié)構(gòu)文件目錄:process unit civil document list;工藝裝置說明:process unit structural specification;工藝裝置樁詳圖:process unit pile details;工藝裝置基礎(chǔ)詳圖;process unit foundation plan;工藝裝置集污池:process unit sump tank;工藝裝置框架立面布置圖:process unit frame elevation;工藝裝置設(shè)備支座詳圖:process unit equipment support detail;工藝裝置通用節(jié)點(diǎn):process unit common joint;單剪連接:single shear connection;工藝裝置管架詳圖:process unit pipe rack detail;工藝裝置欄桿詳圖:process unit detail of handrail;工藝裝置鋼爬梯(有護(hù)籠)通用圖:process unit detail of ladder(with cage);工藝裝置閥門室詳圖:process unit valve house detail;圖例:legend;地下管網(wǎng):under ground(U/G)piping;地下管網(wǎng)布置圖(詳圖):plan of U/G piping(detail of
U/G piping);污水系統(tǒng)圖:flow diagram of industrial/sanitary sewer;圓形混凝土給水閥門井:round reinforce concrete valve pit;室外水表井及安裝圖:outdoor flow pit and construction;室外地上式消火栓安裝圖:construction of outdoor above ground hydrant;化糞池:septic tank;地漏:floor drain;豎項(xiàng)設(shè)計(jì)圖:elevation layout;道路鋪砌及詳圖:details of road and pavement;圍墻平面圖:fence plot plan;通風(fēng)平面圖:ventilation plan;風(fēng)口平面圖:air opening plan;采暖系統(tǒng)圖:isometric drawing for heating;空調(diào)系統(tǒng)圖:isometric drawing for air condition。
八、設(shè)備 1、暖通 軸流風(fēng)機(jī):axial fan;防爆離心機(jī):explosion-proof centrifugal fan;吸頂式房間通風(fēng)器:ceiling ventilator;空氣凈化機(jī):air cleaning unit;風(fēng)冷恒溫橫濕柜式空調(diào):constant temperature and constant humidity (CTCH)air conditioner;單冷柜式分體空調(diào):cabinet-type air conditioner;風(fēng)管:duct;鋼制蝶閥:butterfly damper;單層百葉風(fēng)口:single deflection grill;球閥:globe valve;冷凝水管:condensate pipe;除污器:strainer;防火調(diào)節(jié)閥:fire damper;盒膜式疏水閥組:steam trap group;回風(fēng)管:air return pipe;送風(fēng)管:air supply pipe;新風(fēng):fresh air;排風(fēng) exhaust air;靜壓箱:buffer box;輔助加熱器:booster heater;管配件:pipe fitting;管接頭:pipe joint;短節(jié)(承口,法蘭):flange and bell;短節(jié)(插口,法蘭):flange and spigot;彎頭:elbow;三通:tee;四通:cross;快速接頭:quick- operation joint。
2、工藝設(shè)備 吊車:hoister;反應(yīng)器出料泵:reactor side draw pump;反應(yīng)器進(jìn)料泵:reactor
feed pump;反應(yīng)器循環(huán)泵:reactor recirculation pump;催化劑輸送泵:catalyst feed pump;干燥塔回流泵:drying column reflux pump;塔底泵:column base pump;回收塔進(jìn)料泵:recovery column feed pump;鹽洗塔底泵:salts wash column base pump;閃蒸塔底泵:flash column base pump;精制塔底泵:refining column base pump;蒸汽凝液泵:steam condensate return pump;冷凍劑輸送泵:chilled coolant pump;分離塔底泵:splitter column base pump;冷凝液泵:condensate pump;液環(huán)真空泵:liquid ring vacuum pump;空氣壓縮機(jī):air compressor;冷凍壓縮機(jī):refrigerant compressor;輸送泵:feed(transfer)pump;污水泵:process sump pump;催化劑混合罐蒸汽夾套:catalyst mix tank steam jacket;酸精制回流罐:acid refining Column Reflux Decanter;中壓凝液閃蒸罐:MP steam condensate flash tank;常壓凝液收集罐:atmospheric condensate receiver;酸氣吸收罐:acid relief spray chamber;冷劑罐:chilled coolant tank;干燥塔再沸器:drying column reboiler;干燥塔進(jìn)料預(yù)熱器:drying column feed preheater;回收塔換熱器:recorvery column interchanger;塔頂冷凝器:column overhead condenser;凝液放空冷凝器:atmospheric condensate vent condenser;精制塔:refining column;分離塔:splitter column;反應(yīng)器側(cè)線冷卻器:reactor side draw cooler;反應(yīng)器循環(huán)冷卻器:reactor recirculation cooler;反應(yīng)器氣相冷凝器:reactor vent condenser;副產(chǎn)品放空冷凝器 co-product tank vent condenser。
3、參數(shù) 風(fēng)量:air flow;余壓:net pressure;轉(zhuǎn)速:speed;葉片角度:blade angle;功率:power;電源:voltage;冷量:cooling CAP;熱量:heating CAP;過濾等級:filter efficiency。
九、術(shù)語 1、建設(shè)工程項(xiàng)目:construction project;單位工程:single project;分部工程:subproject;分項(xiàng)工程:subentry project;建設(shè)工程文件:construction project document;工程準(zhǔn)備階段文件:seedtime document of a construction project;監(jiān)理文件:project management document;施工文件:construction document;竣工圖:as-built drawing;竣工驗(yàn)收文件:handing over document;建設(shè)工程檔案:project archive;案卷:file;立卷:filing;歸檔:putting into record;項(xiàng)目竣工驗(yàn)收:completion and delivery of construction project;最新版本:the latest edition;編制:work out (draw up);編輯:compile;施工項(xiàng)目管理:construction project management;項(xiàng)目發(fā)包人:employer;項(xiàng)目承包人:contractor;項(xiàng)目分包人:subcontractor;項(xiàng)目經(jīng)理:construction project manager;項(xiàng)目經(jīng)理部:construction project management team;項(xiàng)目經(jīng)理責(zé)任制:responsibility system of construction manager;項(xiàng)目管理目標(biāo)責(zé)任書:responsibility documents of construction project management;項(xiàng)目管理規(guī)劃大綱:planning outline for construction project management;項(xiàng)目管理實(shí)施規(guī)劃:execution planning for construction project management;項(xiàng)目目標(biāo)控制:object control for construction project;項(xiàng)目風(fēng)險(xiǎn):construction project risk;監(jiān)理大綱:supervising outline;監(jiān)理規(guī)劃:supervising planning;監(jiān)理細(xì)則:supervising detailed regulation;項(xiàng)目風(fēng)險(xiǎn)管理:risk management of construction project;項(xiàng)目成本核算制:cost calculation system of construction project;項(xiàng)目生產(chǎn)要素管理:productive element management for construction project;項(xiàng)目合同管理:contract management for construction project;項(xiàng)目信息管理:information management
for construction project;項(xiàng)目現(xiàn)場管理:site management for construction project ; 項(xiàng) 目 回 訪 保 修 :
return visit and guarantee for repair of construction project ; 項(xiàng) 目 組 織 協(xié) 調(diào) :
organization coordination for construction project ; 項(xiàng) 目 考 核 評 價(jià) :
examination and evaluation of construction project management。
十、罐制作 底板:bottom plate;壁板:shell plate;頂板:roof plate;角鋼圈:top angle:筋板:fib;墊板:pad;罐壁環(huán)縫:horizontal joints in shell;罐壁縱焊縫:vertical joints in shell;補(bǔ)強(qiáng)圈:reinforce plate;銘盤座:nameplate bracket;內(nèi)浮盤:internal floating roof;人孔:manhole;接地板:earth lug;蓋板:plate;預(yù)焊板:preweld plate;腐蝕裕度:corrosion allowance;地震烈度:seismic intensity;充水高度:filling height;液位計(jì)口:liquid meter nozzle;消防口:foam inlet;壁板與底版角焊縫:fillet joint between bottom and shell plate;放空口:vent nozzle;纏繞墊片:spiral wounded gasket;法蘭蓋:blind flange;接管:nozzle neck;踢腳板:baffle plate;踏步板:step plate;外側(cè)板:outer side plate 發(fā);內(nèi)側(cè)板:inner side plate;花紋鋼板:checkered plate。
相關(guān)熱詞搜索:專業(yè)術(shù)語 中英對照