Up to_Speeding,Up

        發(fā)布時(shí)間:2020-03-28 來(lái)源: 感悟愛(ài)情 點(diǎn)擊:

          The Beijing-Shanghai High-Speed Railway wentinto service on June 30, reducingthetravellingtime betweenthetwo cities fromthe previous 14 hoursto around fve.
          The 1,318-km railway was built in a little over three years with a total investment of 221 billion yuan ($34 billion).
          According to the Ministry of Railways, trains run at two speeds on the route, 250 km per hour and 300 km per hour. For the two speeds, the price of a one-way secondclass seat for the whole journey is 555 yuan ($85) and 410 yuan ($63), respectively .
          Beijing Review reporter Wei Yao made a trip from Beijing to Shanghai on June 27 aboard G1 train during a test run on the high-speed railway.
          
          Photos by Wei Yao
          
          注:本文中所涉及到的圖表、注解、公式等內(nèi)容請(qǐng)以PDF格式閱讀原文

        相關(guān)熱詞搜索:Speeding Speeding Up break in pick up

        版權(quán)所有 蒲公英文摘 www.zuancaijixie.com
        91啦在线播放,特级一级全黄毛片免费,国产中文一区,亚洲国产一成人久久精品